Quick Answer:
A screw-terminal to push-in connector conversion is a BOM change, not a like-for-like part swap. Validate the old and new model, conductor construction and ferrule needs, footprint, accessories, assembly access and model-specific ratings before approval. Run a trial with production wire and tooling, then release the change through a traceable record covering drawings, evidence, approvals, stock and effectivity. A catalog family name or a sample that fits one wire is not enough to change the approved bill of materials.
The case for conversion may rest on cost, supply or assembly goals, but it changes a controlled configuration. For OEM buyers, the five checks below turn that proposal into a release decision, with a hold point at each stage.
Why Is This a BOM Change Rather Than a Part Swap?
A bill of materials, or BOM, is the controlled list of parts and quantities used to build a product. Changing one line can affect drawings, purchasing, work instructions, inspection, service parts and stock. General BOM revision-control guidance describes the basic control principle: record what changed, when and by whom, and define the roles, reasons and approvals behind the revision. Apply your own change procedure; the guide is context, not a standard.
Record the commercial trigger and a measurable target. “Faster assembly” is not a target until you define what the trial will measure. The first output is a baseline packet: current BOM line, old and proposed models and drawings, affected assemblies, quantities, requested effectivity and change owner. If a field is blank, the proposal is not ready for technical approval.

1. What Is the Exact Scope of the Change?
Start with a precise “from” and “to” identity. The screw-type terminal block category can help name the current family, but a category is not a part number. Record the manufacturer, full ordering code, variant, accessory set and drawing revision for both sides.
State what should remain unchanged, then prove it. The enclosure, rail, circuit schedule, fusing and neutral or protective-earth functions can still be affected by the substitution. Neutral and protective earth are different functions and cannot substitute for each other.
Define the production boundary by product, serial range, build date or work order. If old and new parts will coexist, say which assemblies may use each and how the build record will distinguish them. Otherwise the build becomes untraceable.
Hold point: the team can name the approved old part and proposed new part, their drawings, affected assemblies and effectivity. Without that baseline, stop before comparing samples.
2. Are the Conductor and Termination Details Compatible?
“The wire fits” is not a compatibility check. Record solid or stranded construction, the conductor class where the approved schedule defines one, cross-sectional area in mm², strip length, ferrules and the number of conductors per connection. Cross-sectional area is not the same as conductor diameter.
The FJ6/PT push-in DIN-rail terminal block page states that the connection accepts direct insertion of solid and ferrule-terminated stranded conductors. It also notes that ferrules should be used for flexible conductors where required, and its table shows conductor ranges that vary by model. Confirm the range and preparation requirements for the exact variant, not the whole series.
A ferrule can create a second BOM change: a new part number, inventory item, crimp tool, inspection point and operator instruction. If the current screw terminal accepts bare stranded wire and the proposed connection needs a ferrule, include that work in the change package.
Name the exact product family as well. “Push-in” and “tool-free” describe a connection approach, not a complete part. HAIYAN’s lever-type compact wire connector is a different family from the PT terminal block. A proposal that names one family but supplies the other must return to the baseline review.

Product Features Lever-operated clamping structure for fast, tool-free wiring. Suitable for solid and stranded copper conductors. Transparent housing for visual inspection of conductor insertion. Compact design for space-saving…
View Product DetailsUse the push-in terminal block category as a starting point, then confirm exact model, port configuration and accessories. If the model data does not state the conductor or ferrule condition, mark it unconfirmed and request the drawing or datasheet.
Hold point: every conductor in the approved schedule has been checked against the exact proposed model, including preparation, ferrule and conductors per port.
3. Will the New Part Fit the Assembly and Service Access?
Similar rail width does not prove fit. Compare height and depth, entry direction, end stops, bridges, markers, test access, partition plates and adjacent components. The PT page describes top entry; a different entry direction can change wire routing, labelling and space above the terminal.
Check the installed envelope: door clearance, wire bend space, cable duct exits, adjacent devices and room to insert or release a conductor. Service access may need to be checked in the assembled panel as well as on a bench.
Use the same drawing revision for layout, terminal and accessories. If dimensions or positions are missing, request a controlled drawing or model-specific sample. A 3D print can help but is not a production drawing. Record the marked-up layout, clearance check, accessory list and sample reference. Custom colour, marking or packaging needs its own BOM record.
Hold point: the proposed model fits the controlled layout, the accessory list is complete, and every clearance issue is resolved or formally accepted.

Product Features Push-in connection technology for tool-free wiring. Direct insertion of solid and ferrule-terminated stranded conductors. Constant spring clamping force ensures vibration-resistant connection. Fast installation and reduced…
View Product Details4. What Should the Assembly Trial Prove?
Use production-representative conditions: the approved conductor schedule, same ferrules and strip tool, intended fixture, representative enclosure, trained operators and draft work instruction. A bench test with one solid wire does not represent stranded wire with a ferrule.
Define pass and fail criteria before the run: insertion and seating, strand containment, conductor damage, label visibility, inspection and removal access, handling time and rework. Set sample size and acceptance criteria in the OEM’s validation plan; no universal number applies here.
Record model, sample identity, conductor sizes, preparation, tooling, operators, date and results. Include failures. If the trial changes strip length, ferrule, torque or work instruction, update the documents and rerun affected checks.
Electrical, thermal and environmental validation are separate from the assembly trial. Confirm the applicable requirements and evidence for the exact model. Do not transfer a test result, rating or certification from a similar family or a catalog heading.
Hold point: the trial report shows a production-representative build, a defined acceptance basis and a clear result. A one-off fit is not validation.

5. What Must the Release Record Show?
The release package should connect the reason to the revised configuration: BOM, affected drawings, exact model datasheet or drawing, conductor schedule, trial report, deviations, work instruction, inspection plan, purchasing data, effectivity and stock disposition.
Record approvals by function and show who approved which scope and when. If a customer or end user must approve, capture that separately; an internal signature is not customer acceptance.
Evidence must match the released part. A certificate, test report or material statement for another model does not transfer automatically. Confirm coverage for the exact model and revision, and record gaps as open items.
Existing stock needs a controlled disposition: build, rework, hold for service or remove from production, authorized by the responsible function. Release is complete only when the BOM revision, drawing, work instruction and effectivity agree.
What Are the Most Common Release Mistakes?
- Approving a generic “push-in” category or a sample that does not match the proposed production drawing.
- Missing the ferrule, tooling, inspection and training effects of the new termination method.
- Checking rail width while ignoring height, entry direction, wire bend space and service access.
- Running a trial with lab wire or an untrained operator and calling it production validation.
- Releasing without an effectivity date, leaving old and new parts mixed in the same build.
- Using evidence that names a similar model, or forgetting service stock and the old part’s support needs.
What Should You Send for Review?
Send the panel layout, conductor schedule, current and proposed BOM lines with model and drawing revisions, quantities, required documents and target validation date. HAIYAN’s one-stop solution describes product selection, BOM matching, sample confirmation and document support. Ask for exact-model and document-scope confirmation, then attach the answer to the change record. Do not release the BOM until model, evidence and trial agree.